OLLES RV6 SE-XMI

Photos from XMI building and assembly

The RV6 project started late 1988 with the empenage kit, as usual. Final assembly was late fall 1991 in my hangar at Barkarby Airfield outside Stockholm. Temperature during the final days was around 0dgr C and testflight took place December 1st. After 50h flight evaluation -XMI got its Permit to Fly in October.
   (Clic for larger pics)

                                               
                       First rivetjob               Horisontal stab        Fuselage front in jigg  Tough job being a bucceteer!  Things to be put on to
                                                                                                                                                                                     the fuselage 

                                                                   
                          Cutting the wood stiffeners    Cutting the intakeseal    Fuselage ready for assembly      First enginestart

 

   HOME                                              
                                                                      Hiding the RV Grin! Fon du Lac 1990, first ride in a RV!